The Frame Appears…

The Frame Appears…

Framework of the North Block takes shape The next stage is to construct the frame for the North block, the living quarters with the kitchen & utility room, the living area, and our two studies.  The whole building is going to be (we learn!) built in two...
Finally, the Ground floor!

Finally, the Ground floor!

It took most of the day, but the ground floor concrete is laid by floodlight! Its a great sight for us to see. But I get a bit ahead of ourselves! Walls cast, but the basement ceiling (top left of the shape) still not cast First of all we move on with the foundations...

Working in Greece!

As we come to the end of the year in which building has actually started, seemed like a good time to reflect on the process.  Most of this comes down to interaction and communications with the builder and the architect, along with a few skirmishes with public...

The Outline takes shape!

Now its back to work!  We’ve moved on since the basement, with a host of issues!   Where the toilet soil pipes will go, finding out all the fittings we need to select and source, how to deal with surface water – the plot is on a slope, and part way down...
Pouring the First Concrete

Pouring the First Concrete

The inspector finally visited!  The first one turned down the opportunity, and the second didn’t have a car!  Had to brought out by our engineer.  But he came, he saw, he concurred! Here is the plot, ready for the basement foundation to be poured The...