Working in Greece!

As we come to the end of the year in which building has actually started, seemed like a good time to reflect on the process.  Most of this comes down to interaction and communications with the builder and the architect, along with a few skirmishes with public...

The Outline takes shape!

Now its back to work!  We’ve moved on since the basement, with a host of issues!   Where the toilet soil pipes will go, finding out all the fittings we need to select and source, how to deal with surface water – the plot is on a slope, and part way down...
Pouring the First Concrete

Pouring the First Concrete

The inspector finally visited!  The first one turned down the opportunity, and the second didn’t have a car!  Had to brought out by our engineer.  But he came, he saw, he concurred! Here is the plot, ready for the basement foundation to be poured The...
Designing our Love Nest

Designing our Love Nest

The design of the house is completed.  After what for Greece is quick, we have our building permit despite the change in construction from prefabricated wood to concrete. We’d asked Eirini, our long-suffering architect/engineer, to design the house for us. She talked...